Routine Test as per IEC Standard for Switchboard
Verification process to which each switchgear panel assembly is subjected during and/or after its manufacture to ensure it meets the requirements of the relevant switchgear and controlgear assembly standard.
As per IEC 61439-1 checking shall be comprise of two categories,
- Checking on Construction
- Checking on Performance
11 Routine verification
11.1 General
11.2 Degree of protection of enclosures
11.3 Clearances and creepage distances
11.4 Protection against electric shock and integrity of protective circuits
11.5 Incorporation of built-in components
11.6 Internal electrical circuits and connections
11.7 Terminals for external conductors
11.8 Mechanical operation
11.9 Dielectric properties
11.10 Wiring, operational performance and function